Optimizers · OptiTanker

Right Vessel.
Right Cargo.
Right Port.
Right Time.

Every voyage is a commercial decision. OptiTanker optimizes vessel scheduling, cargo movement and inventory across the fleet, keeping every terminal supplied at the lowest shipping cost.

Costs from the Singapore–Malaysia trial. Route illustrative.
What OptiTanker does

Your tanker schedule, worked out for cost and supply.

You give it

Your fleet, contracts, cargo demand and tank levels

Vessel availability, charter contracts, cargo grades and daily demand, shore tank limits, port restrictions, fuel and port costs.

It works out

Which vessel, which cargo, which port, and when

Every vessel, grade, parcel size, berth window and contract is weighed together, not one after the other.

You get

A schedule already checked for compliance

Cost and inventory impact are worked out before the plan is confirmed, ready for your schedulers to review.

From the whitepaper

What a downstream oil major measured in a regional trial.

−17%
Total voyage cost
10×
Faster schedule turnaround
0
Tankage threshold breaches
$0.2–1M
Monthly voyage cost reduction

A Singapore–Malaysia trial, run against a live open position list. It compares a fully manual plan with three OptiTanker scenarios across cost, throughput and inventory risk. Figures come from that trial and are not guaranteed outcomes. Your results depend on your fleet, trading pattern and constraints.

Who it is for

Built for the people who own the cargo, not the ships that move it.

Oil and gas majors, commodity traders and cargo owners run tanker plans across multi-grade cargo, several load and discharge ports, and a fleet on different contracts.

Owned vessels, COA and CVC tonnage, and time charters each carry different cost and availability logic. OptiTanker models them together.

Ten voyages to cover. Who carries them?

Illustrative
The industry challenge

Excel was never built to plan a live marine supply chain.

Multi-grade cargo, shifting demand and a fleet split across owned tonnage, COAs, CVCs and spot fixtures now interact in ways no single scheduler can hold in their head.

Volatile demand, fixed inventory

Consumption shifts daily, but tank ullage has to stay within threshold on every grade.

A fleet with mixed obligations

Owned, COA, CVC and time-chartered vessels each carry different cost and availability logic.

Port and vessel compatibility

Draft, LOA, beam, air draft and berth windows rule out vessels a scheduler may not catch in time.

Constant re-planning

One congestion event or breakdown forces a manual rebuild of the whole open position list.

The same shore tank over 30 days, supplied by two different plans.

Illustrative: one grade at one terminal
Inventory assurance

Zero tolerance for tanks running dry.

A missed delivery window at one terminal can cascade into a shortage the plan didn't anticipate.

  • Safety stock, shore tank ullage and daily consumption are modeled continuously against the sailing schedule.
  • Port stock stays within its upper and lower thresholds, for every terminal and every grade.
  • Cargo scheduling follows daily consumption forecasts, not last month's average.
When plans break

A port congests. The schedule is re-solved in minutes.

Port congestion or a vessel breakdown normally forces a full manual re-plan across every affected voyage. OptiTanker re-solves the open position list around the disruption, with cost and inventory impact already quantified.

Most of the saving comes from the rebuilds after each disruption, not from the first plan.Adapted from the Tanker Optimizer white paper, "Disruption Planning"

A tanker is on its way when the port congests.

Illustrative
Core capabilities

Built around the decisions a tanker scheduler actually makes.

Scheduling

Automated tanker scheduling

A compliant schedule across the full open position list in minutes, not the days a manual rebuild takes.

Fit check

Voyage fit check

Matches vessel to voyage on draft, beam, air draft and parcel size before a nomination is made.

Cargo

Cargo allocation

The right grade, in the right parcel size, on the right vessel across multi-grade, multi-port trades.

Inventory

Inventory optimization

Port stock kept within upper and lower thresholds across every terminal and grade.

Forecasting

Demand forecasting

Cargo scheduling aligned with data-driven daily consumption forecasts.

Cost

Cost optimization

Fuel consumption, port dues and demurrage exposure weighed into route and berth-window planning.

Stowage

Multi-grade planning

Multi-grade stowage and parcel sizing across simultaneous multi-port voyages.

Constraints

Port constraint management

Congestion, berth windows and daylight restrictions at every load and discharge port.

Charter

Charter optimization

COA, CVC, time charter and spot balanced to use the tonnage already on contract.

How it works

Every constraint in. One checked schedule out.

  1. 01
    Your data comes inVessel availability and maintenance windows, charter contracts, cargo demand, inventory thresholds, port restrictions, fuel cost and demurrage exposure.
  2. 02
    Everything is weighed at onceOptiTanker evaluates all of it simultaneously, then returns a schedule already checked for compliance.
  3. 03
    Your schedulers compare and chooseBalanced, cost-focus and stock-focus scenarios are shown side by side before you commit to a plan.

Three plans for the same month, side by side.

Illustrative
One model, four planning horizons
Strategic · up to a year→Scheduling · 30–60–90 days→Tactical · 7–30 days→Operational · next 7 days

Inputs

  • VesselsAvailability, maintenance windows, draft, LOA, beam, air draft
  • ContractsOwned fleet, COA, CVC, time charter and spot, with cost and obligation
  • CargoGrades, parcel sizes, daily demand forecasts
  • InventoryShore tank ullage, safety stock, upper and lower thresholds
  • PortsCongestion, berth windows, daylight restrictions
  • CostFuel consumption, port dues, demurrage exposure

Outputs

  • ScheduleA compliant vessel schedule across the full open position list
  • Cargo planGrade and parcel size by vessel and voyage
  • InventoryClosing balances by port, grade and day
  • Voyage costCost priced into every scheduling decision
  • ScenariosBalanced, cost-focus and stock-focus plans side by side
  • DashboardsLive schedule, cost and inventory views, with exports in familiar formats
Use cases

Where the schedule actually breaks, and how it holds.

Charter optimization

Sweating the chartered fleet before going to spot

Every voyage is tested against contracted tonnage first, with spot fixtures reserved for genuine gaps.

OutcomeHigher utilization of tonnage already under contract, and materially lower spot exposure.
Inventory balancing

Zero tolerance for tanks running dry

Safety stock, shore tank ullage and daily consumption are modeled continuously against the sailing schedule.

OutcomeClosing balances that stay above safety stock across the full planning horizon.
Multi-port operations

Absorbing disruption without rebuilding the plan

OptiTanker re-solves the open position list around the disruption in place of a ground-up rebuild.

OutcomeA revised, compliant schedule in minutes, with cost and inventory impact already quantified.
OptiTanker vs manual planning

The same ten decisions, planned two different ways.

Planning decisionManual planningOptiTanker
Schedule creationRebuilt by hand in Excel, voyage by voyageGenerated across the full fleet in minutes
Charter allocationCOA / CVC / TC / spot judged case by caseOptimized jointly across contract types
Voyage cost visibilityEstimated after the plan is builtPriced into every scheduling decision
Inventory planningChecked separately, often after the factContinuously balanced against the schedule
Constraint handlingHeld in the scheduler's memoryEnforced automatically, every voyage
Multi-grade planningManually cross-checked stowage sheetsModeled natively across grades and parcels
Disruption responseFull manual re-planRe-solved around the disruption
Scenario comparisonOne plan at a timeBalanced, cost-focus and stock-focus scenarios side by side
ReportingAssembled manually for reviewLive schedule, cost and inventory dashboards
ScalabilityDegrades as fleet and port count growBuilt to support increasingly complex fleet and port networks
Questions

What planning and commercial teams ask first.

What exactly does OptiTanker optimize?

OptiTanker generates the commercially optimal tanker schedule. It assigns the right vessel to each voyage, the right cargo to each vessel, and the right port and timing to each call, while respecting inventory thresholds, port and vessel constraints, and contract obligations.

Does it handle mixed fleets under different contract types?

Yes. Owned fleet, COA, CVC, time charter and spot fixtures are modeled together, so the plan reflects true availability and cost across the whole fleet rather than one contract type at a time.

Can it manage multi-grade cargo across multiple ports?

OptiTanker natively handles multi-grade stowage, cargo parcel sizing and multi-port discharge sequences within a single voyage plan.

How does it prevent inventory shortages?

Daily demand forecasts are checked against the fleet schedule, keeping every discharge port's stock within its safety threshold.

What kind of cost savings should we expect?

Results depend on fleet size and trading pattern, but trial deployments have shown voyage cost reductions in the range of $200K to $1M per month on a mid-sized regional operation.

How are port restrictions and berth windows handled?

Draft, air draft, LOA, beam, congestion and daylight loading windows are enforced automatically, so infeasible nominations never reach the schedule.

What planning horizon does OptiTanker support?

It spans strategic (up to a year ahead), scheduling (30–60–90 days), tactical (7–30 days) and operational (next 7 days) planning within the same model.

Does OptiTanker integrate with our existing ERP and planning tools?

Yes. Input and output are designed to match existing planning processes, and schedules can be exported in familiar formats for downstream systems.

How long does implementation take?

Implementation typically takes 2 to 3 months, depending on the level of customization required.

What's the business case beyond cost reduction?

Faster, more reliable scheduling, lower operational risk, stronger supply assurance, and the ability to compare balanced, cost-focus and stock-focus scenarios before committing to a plan.

Get started

Optimize your next tanker voyage before it leaves the terminal.

Bring your open position list. We'll show you what OptiTanker would have scheduled instead, and what it would have saved.